Picture 1 of 16

















Gallery
Picture 1 of 16
















OO custom-built Fowler 2P 4-4-0 loco in Somerset and Dorset blue, running, boxed
GBP 48.00
ApproximatelyPHP 3,630.93
Condition:
“in working order with all buffers and couplings present, footplate crew added but one section of ”... Read moreabout condition
Used
An item that has been used previously. The item may have some signs of cosmetic wear, but is fully operational and functions as intended. This item may be a floor model or store return that has been used. See the seller’s listing for full details and description of any imperfections.
Oops! Looks like we're having trouble connecting to our server.
Refresh your browser window to try again.
Shipping:
Located in: Keighley, United Kingdom
Delivery:
Varies
Returns:
30 days return. Buyer pays for return shipping. If you use an eBay shipping label, it will be deducted from your refund amount.
Coverage:
Read item description or contact seller for details. See all detailsSee all details on coverage
(Not eligible for eBay purchase protection programmes)
Seller assumes all responsibility for this listing.
eBay item number:356724962892
Item specifics
- Condition
- Used
- Seller Notes
- Power Type
- DC
- Assembly Status
- Ready to Go/Pre-built
- Corporate Livery
- Somerset and Dorset Joint Railway
- Replica of
- Fowler 2P
- Wheel Configuration
- 4-4-0
- Scale
- 1:76
- Material
- Plastic, Pressed Steel
- Control System
- Analogue
- Gauge
- OO
- Colour
- Blue
- Brand
- Hornby
- Type
- Steam Locomotive
- Rail System
- Two-Rail System
- Era
- Era 2 - Pre-Grouping (1875 - 1922)
- Features
- Painted, Tender, Custom Built
- Country/Region of Manufacture
- United Kingdom
Item description from the seller
Seller feedback (251)
- Automatyczna opinia eBay- Feedback left by buyer.Past monthZamówienie zostało zrealizowane – ze śledzeniem i na czas
- e***a (2319)- Feedback left by buyer.Past monthVerified purchaseExcellent ebayer. Very pleased.
- Automatyczna opinia eBay- Feedback left by buyer.Past monthZamówienie zostało zrealizowane – ze śledzeniem i na czas