Picture 1 of 2
Picture 1 of 2
LIGHTECH VERKLEIDUNGSSC HRAUBEN-KIT FUR DUCATI MONSTER 696 2008 > 2013 GOLD 8D6C
EUR 119.90
ApproximatelyPHP 7,420.16
Condition:
New
A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is applicable). Packaging should be the same as what is found in a retail store, unless the item was packaged by the manufacturer in non-retail packaging, such as an unprinted box or plastic bag. See the seller's listing for full details.
Postage:
EUR 45.00 (approx PHP 2,784.88) Standard International.
Located in: Torre Del Greco, Italy
Delivery:
Estimated between Tue, 8 Oct and Tue, 22 Oct to 43230
Returns:
30 days return. Buyer pays for return shipping.
Coverage:
Read item description or contact seller for details. See all detailsSee all details on coverage
(Not eligible for eBay purchase protection programmes)
Seller assumes all responsibility for this listing.
eBay item number:186413842187
Item specifics
- Condition
- Herstellernummer
- 8D6CORO
- Hersteller
- LIGHTECH
- Marke
- DUCATI
- Motorrad Model
- MONSTER 696
- Jahr
- 2008 2009 2010 2011 2012 2013
- Farbe
- GOLD
- Type
- Kit Viti
- Material
- Eloxiertes Ergal
- St�cke
- 47
- Position
- VERKLEIDUNGSSCHRAUBEN
- EAN
- 8052393165295
Item description from the seller
Business seller information
Value Added Tax Number:
- IT 10501531213
Popular categories from this store
Seller feedback (26,831)
- 1***a (229)- Feedback left by buyer.Past monthVerified purchaseottimo
- 9***j (19)- Feedback left by buyer.Past monthVerified purchaseAs described. One bolt for montage is only 25mm should be 30mm had to order 2 with right length 30mm. Item was sold out and I had to find out by emailing seller who as fin as it was gave me a new delvering date wich resultet in a relatively long lead time.
- 9***j (19)- Feedback left by buyer.Past monthVerified purchaseAs described. One bolt for montage is only 25mm should be 30mm had to order 2 with right length 30mm. Item was sold out and I had to find out by emailing seller who as fin as it was gave me a new delvering date wich resultet in a relatively long lead time.