|Listed in category:
Have one to sell?

Multi Purpose Garden Wire Heavy Duty 50m Roll Plant Tie Support Training Fencing

GBP 8.49
ApproximatelyPHP 642.22
Condition:
New with tags
More information - About this item condition
55 available61 sold
People want this. 10 people are watching this.
This one's trending. 61 have already sold.
Shipping:
Does not ship to United States.
Located in: Cambridge, United Kingdom
Delivery:
Varies
Returns:
No returns accepted.
Coverage:
Read item description or contact seller for details. See all detailsSee all details on coverage
(Not eligible for eBay purchase protection programmes)
Seller assumes all responsibility for this listing.
eBay item number:175020889866
Last updated on Oct 14, 2024 22:21:38 PHTView all revisionsView all revisions

Item specifics

Condition
New with tags
Colour
Green
Item Height
n/a
Material
PVC-coated steel
Type
Wire
Compatible Plant Type
Cactus, Calathea, Canary Island Date Palm, Christmas Cactus, Dracaena, Ficus, Flowering Plant, Fruit, Orchid, Rose
Number in Pack
1
MPN
Does Not Apply
Indoor/Outdoor
Outdoor
Brand
Unbranded
EAN
Does not apply

Item description from the seller

Seller business information

VAT number: GB 276120515
About this seller

Camgrow store

99.9% positive feedback151K items sold

Joined Jan 2006
Usually responds within 24 hours
Welcome to Camgrow, your hub for hydroponics and indoor gardening. We're more than a store; we're a community of plant enthusiasts dedicated to helping you grow your plants smarter and better. At ...
See more

Detailed Seller Ratings

Average for the last 12 months
Accurate description
5.0
Reasonable shipping cost
5.0
Shipping speed
5.0
Communication
5.0

Seller feedback (38,045)

All ratings
Positive
Neutral
Negative
  • *****- Feedback left by buyer.
    Past 6 months
    Verified purchase
    Good value, good price
  • *****- Feedback left by buyer.
    Past 6 months
    Verified purchase
    All good
  • *****- Feedback left by buyer.
    More than a year ago
    Verified purchase
    An assessment of the duration to implement Itential +NSO for each product grouping and assessment of the duration to reproduce the legacy systems. This should be on a backplane (gant chart) of the overall RT migration.
See all feedback
This is a private listing and your identity will not be disclosed to anyone except the seller.